Strategics | Studies, Essays, Thesises » CBM+ Enabled Readiness NAVAIR

Datasheet

Year, pagecount:1982, 4 page(s)

Language:English

Downloads:2

Uploaded:September 21, 2023

Size:2 MB

Institution:
-

Comments:

Attachment:-

Download in PDF:Please log in!



Comments

No comments yet. You can be the first!

Content extract

CBM+ Enabled Readiness NAVAIR Dec 07, 2017 Presented to: DoD Maintenance Symposium Presented by: Mr. Roy Harris Director Aviation Readiness and Resource Analysis Department, NAVAIR (AIR-6.8) Distribution Statement A – Approved for public release; distribution is unlimited – NAVAIR SPR #2017-1032 1 CBM/CBM+ Enabled Enterprise Distribution Statement A – Approved for public release; Distribution is unlimited – NAVAIR SPR #2017-1032 2 CBM+ One-Time Reassessments • Objective: Reset MH-60R and H-53E dynamic component life limits using HUMS data and Regime Recognition (RR) capability to update fleet usage spectrums and recalculate service life limits • Initial SLBs released in March 2017 using available RR tools and validated fleet usage data at time of release, subsequent MH-60R SLB update released May 2017, PMIC updated via IRAC on 25May17 MH-60R Components Assessed Limits Increased Limits Decreased Limits Unchanged 85 51 1 33 17 6 11 DTG

R071852ZMAR17 DTG R151815ZMAY17 CH-53E DTG R011037ZMAR17 • SLBs did not include components with significant life decreases, significant logistics impacts, or life limits in excess of current platform tracking requirements • Delivers Time On Wing increases where reliability enables dynamic components to reach high time, reduces maintenance requirements/costs, and increases readiness in support of RBA, and increases safety Distribution Statement A – Approved for public release; Distribution is unlimited – NAVAIR SPR #2017-1032 3 Distribution Statement A – Approved for public release; Distribution is unlimited – NAVAIR SPR #2017-1032 H-1 CBM Realized 4